The Venados II Building - 01 is an industrial facility under development within an industrial park under construction in the Cueros de Venados industrial submarket in Tijuana, scheduled for delivery in the second quarter of 2025. It features 1,500 KVA available, with the option to expand, and the flexibility to be customized through a spec-to-suit scheme. Strategically located 30 minutes from the Otay Mesa commercial border, it offers direct access to a qualified labor pool and quick connectivity to Boulevard 2000, facilitating logistics and access to major industrial corridors in the region. It has a construction area of 175,457 ft² (16,298 m²), with a clear height of 30 ft (9.1 m), 3% office space, up to 10 loading docks, 2 ramps, 3% natural lighting through skylights, and a fire protection system with sprinklers; its construction type is Tilt-up.
| Property Type | Vacant Area (m²) | Availability | Request |
|---|---|---|---|
| Industrial | 1- 16,300.48 | Negotiable |
|