The "Avant Industrial Park - 07 (Expansion I)" warehouse is strategically situated in the López Mateos Sur submarket, one of Guadalajara, Jalisco’s most dynamic industrial hubs. Currently under construction, this 25,868 m² (278,440 sq ft) facility is designed for versatility and efficiency, featuring a 10-meter (32.8 ft) clear height and an optimized column spacing of 12 x 33 meters (39 x 108 ft), ideal for logistics and manufacturing operations. The warehouse will include 200 lux LED lighting with 8% natural illumination, ventilation providing 2–3 air changes per hour for a comfortable workspace, a fire suppression system with hose cabinets, and robust electrical infrastructure supported by a 500 KVA transformer. With an estimated delivery date in Q3 2025